European long distance path E8 - part Romania
The print
Printed to order at 300 DPI, rendered natively at your size and never upscaled. Print only; the frame in the photos is for scale.
Shipping & returns
Printed in 2 to 5 business days, then 3 to 5 in transit within the US, rolled in a sturdy tube. Free US shipping; outside the US, shipping is calculated at checkout. 14-day reprint-or-refund guarantee, any reason, no return shipping. You have 1 hour after checkout to change trail, style or size, just reply to your confirmation email. Full returns policy.
About the European long distance path E8 - part Romania trail
Spanning 1.1 miles in Serbia, European long distance path E8 - part Romania climbs 628 feet in total, from a low of 214 feet to a high of 883 feet. The steepest pitch reaches 44 percent, against an average of 571 feet of gain per mile. On our gain-and-distance scale it falls in the easiest band. The nearest town is Drobeta-Turnu Severin, 7 miles away.
The trail
The E8 European long distance path or E8 path is one of the European long-distance paths, going 4,700 km (2,900 mi) across Europe, from County Cork in Ireland to Bulgaria.
Text: Wikipedia, CC BY-SA 4.0
Questions about the European long distance path E8 - part Romania print
What sizes does the European long distance path E8 - part Romania poster come in?
Is this made from real elevation data?
How hard is European long distance path E8 - part Romania?
Trail geometry and place names for this print: Map data © OpenStreetMap contributors, ODbL. Elevation: AWS Terrain Tiles. The derived trail dataset is published at /open-data. Best months are an estimate from NASA POWER climate data (CC BY 4.0), 2001 to 2020 monthly averages adjusted to the trail's elevation, not an official season; check current conditions and closures.